Ontario Energy Board

Decision Information

Summary:

Union Gas Limited (Union) applied with the Ontario Energy Board (OEB) on August 19, 2015 for leave to increase the operating pressures in the Bentpath East, Booth Creek, and Mandaumin natural gas storage pools (Pools) above current operating pressures that were set in the OEB's original conditions of approval1 (2016 Storage Enhancement Project). In order to increase the operating pressure, Union needs a leave from the OEB to vary certain conditions in the original authorization orders issued under sections 38(1) and 40(1) of the Ontario Energy Board Act, 1998 (the Act). Union filed proposed wording for the conditions that would replace each of the original maximum operating pressure conditions in the OEB orders for each of the Pools.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.