Ontario Energy Board

Decision Information

Summary:

Union Gas Limited (Union) filed an application with the Ontario Energy Board (OEB) on
March 11, 2015 under subsection 90(1) of the Ontario Energy Board Act, 1998 (the Act)
for leave to construct three natural gas pipelines and ancillary facilities (the Project).
One pipeline is approximately 1.5 kilometres of nominal pipe size (NPS) 12 inch; the
second is approximately 2.0 kilometres of NPS 10 inch; and the third is approximately
2.3 kilometres of NPS 6 inch. The Project is located in the City of Greater Sudbury
(Sudbury). Two maps showing the location of the Project are attached as Schedule A.