Ontario Energy Board

Decision Information

Summary:

Enbridge Gas Distribution Inc. (Enbridge) filed an application with the Ontario Energy Board (OEB) to extend the boundaries of its Chatham 7-17-XII gas storage area (Chatham D Pool). Enbridge proposed to increase the buffer zone included in the storage area by adding 10 hectares to the storage area. This addition represents an increase of about a 4.7% in the total storage area. Enbridge also applied for approval to operate the expanded Chatham D Pool.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.