Summary:

In October 2016, the National Energy Board (Board) issued the Towerbirch Report with respect to NOVA Gas Transmission Limited’s (NGTL) Towerbirch Expansion Project (Towerbirch or Project) located in northwest Alberta and northeast British Columbia (BC). The Board recommended approval of NGTL’s application under Part III of the National Energy Board Act (NEB Act) to construct and operate the Project, consisting of a mainline expansion and an extension (the TLS), subject to a number of conditions. With respect to Part IV of the NEB Act, the Board approved NGTL’s application to determine the tolls for service on the expansion in accordance with the NGTL toll design methodology in effect.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.