On 18 July 2014, Woodside Energy Holdings Pty Ltd. (Woodside Energy) applied to the National Energy Board (Board) pursuant to section 117 of the National Energy Board Act (NEB Act) for a licence (Licence) to export liquefied natural gas (Application). Woodside Energy seeks a Licence duration of 25 years, starting on the date of first export with an annual volume of 20 million tonnes, which corresponds to a natural gas equivalent of 1 022 Bcf or 28.95 billion cubic metres annually1, and a maximum quantity of 807 billion cubic metres over the term of the Licence2.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.