British Columbia Utilities Commission

Decision Information

Summary:

British Columbia Hydro and Power Authority’s (BC Hydro) 2015 Rate Design Application (Application, RDA) filed on September 24, 2015 is its first comprehensive rate design application since 2007, and only the third such application in BC Hydro’s history. This rate design application contains BC Hydro’s F2016 Cost of Service study; proposals for default Residential, Small General Service, Medium General Service, Large General Service and Transmission Service rates; and proposals for its Electric Terms and Conditions.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.