Summary:
By Order G-210-13 and its Decision dated December 11, 2013 (2013 Decision), the British Columbia Utilities A.Commission (Commission) approved the continuance of the FortisBC Energy Inc. (FEI) biomethane program on a permanent basis with certain modifications as directed in the 2013 Decision. The 2013 Decision set out a cost-based rate methodology for determining the Biomethane Energy Recovery Charge (BERC) that recovers all biomethane program costs;
Decision Content
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.