Alberta Utilities Commission

Decision Information

Summary:

On June 28, 2013, AltaGas Utilities Inc. (AUI) filed a 2013-2017 Performance-Based Regulation (PBR) Phase II application with the Alberta Utilities Commission (AUC or the Commission). The application requested approval of the following:
The proposed 2012 cost of service study (COSS) and the use of the proposed cost
functionalization, classification and allocation principles and methods for the PBR period
2013-2017.
The proposed 2013-2017 Phase II rate design based on the 2012 Phase II rates and the
2012 rate level revenue requirement.
The implementation of the 2013-2017 Phase II rate structure resulting from the 2012
Phase II rates proposed in the application, effective January 1, 2014.
The proposed method to administer any deficiency or excess in 2013 resulting from delay
in implementing the 2013-2017 Phase II rate structure.
The proposed terms and conditions of service (T&Cs).
A negotiated settlement process with interested parties to determine each of the above.

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.