Alberta Utilities Commission

Decision Information

Summary:

AltaGas Ltd. (AltaGas), by Application No. 1610070 registered on November 14, 2013, applied to the Alberta Utilities Commission (AUC or the Commission) to alter and operate the Parkland power plant from 7.2 megawatt (MW) power plant to a 10.275 MW power plant. AltaGas informed the Commission that the connection point of the proposed power plant will remain the same as in Order No. 2008-93.