ATCO Gas and Pipelines Ltd. (ATCO), by Application 22947-A001 registered on September 14, 2017, filed an application with the Alberta Utilities Commission under Section 11 of the Pipeline Act and Section 4.1 of the Gas Utilities Act for the following near the village of Birch Cove:
- splitting line 8 into lines 8, 91 and 92 -splitting line 66 into lines 66, 93 and 94
- mapping amendment of original line 66
- lines 91 and 93 are to be abandoned in place and then recorded as abandoned under a subsequent application
- addition of newly constructed pipeline (line 95 – 0.05 kilometres of 323.9-millimetre outside diameter pipeline)
- addition of newly constructed pipeline (line 96 – 0.07 kilometres of 323.9-millimetre outside diameter pipeline)