AltaGas Utilities Inc. (AltaGas), by Application 22895-A001 registered on August 23, 2017, filed an application with the Alberta Utilities Commission under Section 11 of the Pipeline Act and Section 4.1 of the Gas Utilities Act for the addition of a newly constructed pipeline (line 45 – 0.13 kilometres of 60.3-millimetre outside-diameter pipeline) near Stettler.