Alberta Utilities Commission

Decision Information

Summary:

ATCO Gas and Pipelines Ltd. (South) (ATCO), by Application 22701-A001 registered on May 30, 2017, filed an application with the Alberta Utilities Commission under Section 12 of the Pipeline Act and Section 4.1 of the Gas Utilities Act for the following:
splitting of line 20 into lines 20, 30 and 31
pipe specification amendment of lines 21, 30 and 31
environmental code amendment of lines 21 and 31
‘From Location’ LSD amendment of line 21 from 6 to 5
length amendment of line 21 from 0.61 kilometres to 0.13 kilometres
‘To Location’ LSD amendment of original line 20 from 6 to 5
length amendment of original line 20 from 2.53 kilometres to 3.01 kilometres resulting in revised line lengths of new line 20 as 2.11 kilometres, new line 30 as 0.24 kilometres and new line 31 as 0.66 kilometres

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.