Alberta Utilities Commission

Decision Information

Summary:

ATCO Gas and Pipelines Ltd. (South) (ATCO), by Application 22484-A001 registered on March 17, 2017, filed an application with the Alberta Utilities Commission under Section 12 of the Pipeline Act and Section 4.1 of the Gas Utilities Act for the following in Edmonton:
-reinstatement of removed line 5 as operating
-rsplitting of removed line 18 into lines 18 and 28
-reinstatement of a portion of removed line 18 as operating line 28
-splitting of line 22 into lines 22, 29 and 30
-pipe grade amendment of line 29 from grade 241 category 1 to grade 359 category 2
- pipe wall thickness amendment of line 29 from 3.9 to 3.2 millimetres
- length amendment of original line 22 from 0.66 to 0.57 kilometres
-mapping amendment of original lines 18 and 22
-pipe wall thickness amendment of line 21 from 3.91 to 2.77 millimetres
-pipe grade amendment of line 21 from A25 to B

Decision Content

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.